Washington, DC
Owner: National Park Service

On site work included:

  • Site Electrical, and Utilities
  • Stone Work
  • New 4000 Seats
  • Emergency generator UPS Backup system
  • Installation of two electrical towers
  • 2 New Electrical Systems

The project posed several challenges that were met while execution:

  • Work was completed during the cold winter months
  • Poor soil was discovered which was needed to be replaced
  • Despite additional work and poor weather the project was completed on time